Lighting for a home in Australia.

Building in
Compared with

Lighting for a home in Australia: worth buying in Foshan.

Worth buying in Foshan

Lighting

0% duty with the ChAFTA certificate. Fittings must meet Australian electrical safety rules.

Typical saving landed52–67%on a chandelier, against luxury retail
Duty0% with ChAFTA5% without the certificate
Production4–6 weeksafter deposit
  • RCM mark and a registered Australian supplier (EESS)
  • 230 V / 50 Hz with Australian-approved drivers
  • Installed by a licensed electrician

Importing chandeliers and lighting from China to Australia →

Get real prices for your categories. Tell us which pieces you're considering and we'll send factory prices, landed in your currency, with an honest view on what to buy locally.

Talk it through with Vinay

Not sure about a quote, a category or your timing? Tell us what you're weighing up and you'll get an honest answer, usually within a day.

Keep it

Everything you work out in these tools adds up in one project: your budget, containers, dates and trip. Save it to get a link by email, or print it.

The short answer

Worth buying in Foshan 0% duty with the ChAFTA certificate. Fittings must meet Australian electrical safety rules.

Duty and taxes on chandeliers and lighting from China

Customs duty (tariff 9405)5% general · 0% with ChAFTA
GST10% of goods + freight + insurance + duty
Import processing chargeA$152 over A$10,000 (electronic)
Biosecurity chargeA$71 per sea declaration
Stink-bug season measuresRandom inspections possible, 1 Sep–30 Apr

What a typical piece costs landed

A chandelier that sells for about A$8,622 at luxury retail lands at about A$2,861–A$4,146 from Foshan, delivered: 52–67% less. That includes our sourcing, inspection and service fee (about 35% of the factory price), its share of a 40′ container, insurance, every duty, customs and port charges, GST and delivery.

What Australia will ask for

  • RCM mark and a registered Australian supplier (EESS)
  • 230 V / 50 Hz with Australian-approved drivers
  • Installed by a licensed electrician

Lead time and packing

Production takes 4–6 weeks after the deposit; made-to-order pieces need 2–4 weeks first for samples and sign-off. Crystal and glass packed separately; large chandeliers in wooden crates. In Foshan we source them in the guzhen lighting town.

Work it out for your home

How we work it out

For each category we take a typical piece (a sofa, a 10-seat dining table, 10 metres of kitchen cabinets…) at the retail level you choose, the price a Foshan factory charges for comparable materials and build, and land it properly: our sourcing, inspection and service fee (about 35% of the factory price), its share of a 40′ container (to a US home through our logistics partner, priced from a client's real shipment to Dallas in October 2026, adjusted to Los Angeles; to Sydney at index freight rates), insurance, every duty and tariff for the category, customs and port charges, GST in Australia, and delivery to the house.

The verdict also weighs things that don't show in the price: anti-dumping orders, bans (engineered stone in Australia), and certifications a plumber, electrician or inspector will ask for. "Usually buy locally" means the duties or rules make it a poor bet for most homes, not that it is impossible. "Check before buying" means the standard duties make it a poor buy, but a factory with its own lower rate or a different construction can change that: we check the factory and the classification and confirm the landed cost in writing before you order.

Sources

Rates and rules last checked 15 October 2026.

Questions

Is it worth importing chandeliers and lighting from China to Australia?

Worth buying in Foshan. 0% duty with the ChAFTA certificate. Fittings must meet Australian electrical safety rules.

What duty do chandeliers and lighting from China pay in Australia?

0% with a ChAFTA certificate of origin from the factory (5% without), plus 10% GST on the goods, freight, insurance and duty.

How long do chandeliers and lighting take from Foshan?

Production takes 4–6 weeks; with samples, inspection, loading, the sea crossing and customs, plan on about 17 weeks door to door for made-to-order pieces.

Save your project

We use this only to reply and send what you asked for. Privacy